A
-
Abdollahy, M
Determination of optimal conditions in column flotation of Masoud Abad Lorestan
Talc Mine [Volume 7, Issue 14, 2012, Pages 91-97]
-
Abdollahy, M
kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
-
Abdollhy, M
The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
-
Abolghasemi, H
The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
-
Afraei, S
The study of effective factors on Hardy Cross method convergence in mine ventilation networks analysis [Volume 7, Issue 17, 2013, Pages 15-21]
-
Afzalaghaei, A.R
Back Analysis of Siah Bisheh Dam Powerhouse Cavern Using
Instrumentation’s Results [Volume 7, Issue 14, 2012, Pages 83-90]
-
Ahmadi, M
A New Method for Determination of Kaiser Effect from Rock Acoustic Emission Signals [Volume 7, Issue 17, 2013, Pages 61-72]
-
Alizadeh Sevari, B
TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
-
Allami, M
Presentation of Empirical Relations for Determining Deformation Modulus in Rock Masses of Southwest of Iran [Volume 7, Issue 16, 2012, Pages 79-87]
-
Amini, M
Measuring Permeability Coefficient of a Granular Soil against Acidic Solutions in Heap Leaching Structures [Volume 7, Issue 16, 2012, Pages 43-52]
-
Annabestani, M
Design and Installation of a Particle Size Analyzer for Mineral Processing Plants [Volume 7, Issue 14, 2012, Pages 99-105]
-
Arabamiri, A.R
Two and Three Dimensional Modeling of Electrical Tomography Data Applied for Studying Qanat and Subsurface Shallow Structures [Volume 7, Issue 17, 2013, Pages 107-112]
-
Asghari, O
Simulation of mineral grades and decrease of conditional variance of simulation using hard and soft conditioning data, based on Local moment constraints method. [Volume 7, Issue 16, 2012, Pages 13-23]
-
Ataei, M
Presentation of Statistical Models for Predicting the Ornamental Stone
Sawability [Volume 7, Issue 14, 2012, Pages 31-40]
-
Ataei, M
Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
-
Ataei, M
Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
-
Ataei, M
TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
B
-
Basiri, M.H
Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
-
Basiri, M.H
Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
D
-
D, D
Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
-
Dehghani, A
Evaluation of Alternative Methods for Estimation of Bond Work Index
(Case Study: Choghart Iron Ore) [Volume 7, Issue 14, 2012, Pages 63-68]
-
Dehghani, A
Replacement of Dynamite with ANFO in Tunneling [Volume 7, Issue 17, 2013, Pages 1-14]
-
Doulati, F
Determination of Residual Component of Gravitimetry Data Using Probability Plot Modeling Method [Volume 7, Issue 17, 2013, Pages 23-32]
E
-
Ebrahimi, M.A
An Equation to predict ground surface settlement due to metro tunneling using EPB TBM [Volume 7, Issue 15, 2012, Pages 67-76]
-
Ebrahimi Farsangi, M.A
An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
-
Emeri, X
Simulation of mineral grades and decrease of conditional variance of simulation using hard and soft conditioning data, based on Local moment constraints method. [Volume 7, Issue 16, 2012, Pages 13-23]
-
Eshaqi, E
Two and Three Dimensional Modeling of Electrical Tomography Data Applied for Studying Qanat and Subsurface Shallow Structures [Volume 7, Issue 17, 2013, Pages 107-112]
-
Esmaeili, K
Investigation of Heavy metals Enrichment in Stream Sediments of Sungun Porphyry Copper Deposit [Volume 7, Issue 17, 2013, Pages 33-39]
-
Esmaeili, M.J
Design and Installation of a Particle Size Analyzer for Mineral Processing Plants [Volume 7, Issue 14, 2012, Pages 99-105]
F
-
Fanipakdel, M.R
Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
-
Farzanegan, A
Discharge Grate Effect on Simulation of Ball Mills [Volume 7, Issue 16, 2012, Pages 33-41]
-
Fasihi, E
Selection of Suitable Mechanized Machine for Tehran Metro Line7 Project (East – West Tunnel) [Volume 7, Issue 15, 2012, Pages 77-86]
-
Fathi, M.B
Determination of optimal conditions in column flotation of Masoud Abad Lorestan
Talc Mine [Volume 7, Issue 14, 2012, Pages 91-97]
-
Foroutan, R
Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
G
-
Gharibi, Kh
Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
-
Ghavami, R
Application of the MARS modeling to estimate the gold values based on the paragenetic elements for an exploration data set [Volume 7, Issue 15, 2012, Pages 15-23]
-
Ghavami, R
Determination of Residual Component of Gravitimetry Data Using Probability Plot Modeling Method [Volume 7, Issue 17, 2013, Pages 23-32]
-
Ghazvinian, A
A New Method for Determination of Kaiser Effect from Rock Acoustic Emission Signals [Volume 7, Issue 17, 2013, Pages 61-72]
-
Ghoddousi, H
Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
-
Goshtasbi, K
Estimating The Deformation Modulus of Rock Mass With Use of Seismic Tomography [Volume 7, Issue 17, 2013, Pages 83-92]
H
-
Haji Amin Shirazi, H
Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
-
Hamidkhah, O
An investigation of grade variability of the Esfordi phosphate plant feed using
geostatistical method [Volume 7, Issue 14, 2012, Pages 51-61]
-
Hassani Sadrabadi, S
Evaluation of Alternative Methods for Estimation of Bond Work Index
(Case Study: Choghart Iron Ore) [Volume 7, Issue 14, 2012, Pages 63-68]
-
Hassanzadeh, A
Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
-
Havaej, M
An Equation to predict ground surface settlement due to metro tunneling using EPB TBM [Volume 7, Issue 15, 2012, Pages 67-76]
-
Hayati, M
Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
-
Hoseini, M
Back Analysis of Siah Bisheh Dam Powerhouse Cavern Using
Instrumentation’s Results [Volume 7, Issue 14, 2012, Pages 83-90]
-
Hoseini, M
Presentation of Empirical Relations for Determining Deformation Modulus in Rock Masses of Southwest of Iran [Volume 7, Issue 16, 2012, Pages 79-87]
-
Hoseini, S.H
Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
-
Hoseinpour, M
Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
J
-
Jalali, S.M.E
Influence of Fleet Tracking on the Reliability of Ventilation System in Underground Mines
Case Study: Takht Coal Mine [Volume 7, Issue 14, 2012, Pages 1-14]
-
Jalali, S.M.E
Optimization of Pillar Size in Faryab Chromite Mine Considering Extraction Sequences [Volume 7, Issue 15, 2012, Pages 35-47]
-
Jamshidi, H
An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
-
Javanshir, S
The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
K
-
Kamkarrohani, A
Two and Three Dimensional Modeling of Electrical Tomography Data Applied for Studying Qanat and Subsurface Shallow Structures [Volume 7, Issue 17, 2013, Pages 107-112]
-
Kargar- Dianati, M.R
Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
-
Khalesi, M.R
Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
-
Khalokakaei, R
Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
-
Khayrollahi, H
Application of clustering in preparation of pseudo geological maps using airborne geophysical data [Volume 7, Issue 16, 2012, Pages 1-12]
-
Khodadadi, A
Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
-
Khodadadi darban, A
The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
-
Kianinia, Y
Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
-
Koleini, S.M.J
Determination of optimal conditions in column flotation of Masoud Abad Lorestan
Talc Mine [Volume 7, Issue 14, 2012, Pages 91-97]
-
Koleini, S.M.J
kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
M
-
Madani, H
The study of effective factors on Hardy Cross method convergence in mine ventilation networks analysis [Volume 7, Issue 17, 2013, Pages 15-21]
-
Madani, S.H
Numerical Investigating Of Methane Gas Concentration In Mine Face Case study: Mike Mine [Volume 7, Issue 15, 2012, Pages 49-55]
-
Maleki Tehrani, M.A
Simulation of mineral grades and decrease of conditional variance of simulation using hard and soft conditioning data, based on Local moment constraints method. [Volume 7, Issue 16, 2012, Pages 13-23]
-
Manafi, Z
kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
-
Mansouri, H
An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
-
Mansouri, H
Replacement of Dynamite with ANFO in Tunneling [Volume 7, Issue 17, 2013, Pages 1-14]
-
Masoomi, H
An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
-
Mehrishal, S.A
Modeling of the Rock Joints Mechanical Behavior Considering Surface Roughness during the Direct Shear Test [Volume 7, Issue 16, 2012, Pages 69-78]
-
Memarian, H
Study of the Sources and Mechanisms of Produced H2S in Nosoud Tunnel (West of Kermanshah) [Volume 7, Issue 15, 2012, Pages 1-14]
-
Mikaeil, R
Presentation of Statistical Models for Predicting the Ornamental Stone
Sawability [Volume 7, Issue 14, 2012, Pages 31-40]
-
Mikaeil, R
Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
-
Mirzaei, Z
Discharge Grate Effect on Simulation of Ball Mills [Volume 7, Issue 16, 2012, Pages 33-41]
-
Mirzaeian, U
Modeling of the Rock Joints Mechanical Behavior Considering Surface Roughness during the Direct Shear Test [Volume 7, Issue 16, 2012, Pages 69-78]
-
Mohammadi Moskouei, M
Topographic correction of hyperspectral data of west east-Azarbayjan [Volume 7, Issue 15, 2012, Pages 25-33]
-
Monjezi, M
Determination of Optimized Excavation Pattern and Execution of Tunnel Support in the Weak Rocks (A Case Study) [Volume 7, Issue 15, 2012, Pages 97-102]
-
Moore, F
Investigation of Heavy metals Enrichment in Stream Sediments of Sungun Porphyry Copper Deposit [Volume 7, Issue 17, 2013, Pages 33-39]
-
Mostofi, N
kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
N
-
Naderi, H
kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
-
Nikkhah, M
A New Method for Determination of Kaiser Effect from Rock Acoustic Emission Signals [Volume 7, Issue 17, 2013, Pages 61-72]
-
Niknam, B
Numerical Investigating Of Methane Gas Concentration In Mine Face Case study: Mike Mine [Volume 7, Issue 15, 2012, Pages 49-55]
-
Njafi, M
Optimization of Pillar Size in Faryab Chromite Mine Considering Extraction Sequences [Volume 7, Issue 15, 2012, Pages 35-47]
P
-
Parandeh, L
Evaluation of Alternative Methods for Estimation of Bond Work Index
(Case Study: Choghart Iron Ore) [Volume 7, Issue 14, 2012, Pages 63-68]
R
-
Rahimipour, Gh.R
Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
-
Rahmannejad, R
An Equation to predict ground surface settlement due to metro tunneling using EPB TBM [Volume 7, Issue 15, 2012, Pages 67-76]
-
Rezaee, S
Study of the Sources and Mechanisms of Produced H2S in Nosoud Tunnel (West of Kermanshah) [Volume 7, Issue 15, 2012, Pages 1-14]
-
Rezaei, A
Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
-
Rezaei, Z
Influence of Fleet Tracking on the Reliability of Ventilation System in Underground Mines
Case Study: Takht Coal Mine [Volume 7, Issue 14, 2012, Pages 1-14]
S
-
Sahabi, F
Study of the Sources and Mechanisms of Produced H2S in Nosoud Tunnel (West of Kermanshah) [Volume 7, Issue 15, 2012, Pages 1-14]
-
Salarirad, H
Numerical Investigating Of Methane Gas Concentration In Mine Face Case study: Mike Mine [Volume 7, Issue 15, 2012, Pages 49-55]
-
Sayadi, A.R
Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
-
Sayadi, A.R
Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
-
Sayadi, A.R
Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
-
Sayadi, A.R
Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
-
Serati, M
TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
-
Sereshki, F
Influence of Fleet Tracking on the Reliability of Ventilation System in Underground Mines
Case Study: Takht Coal Mine [Volume 7, Issue 14, 2012, Pages 1-14]
-
Shadman, M
Application of clustering in preparation of pseudo geological maps using airborne geophysical data [Volume 7, Issue 16, 2012, Pages 1-12]
-
Shafaei, S.Z
Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
-
Shahsavani, D
Application of the MARS modeling to estimate the gold values based on the paragenetic elements for an exploration data set [Volume 7, Issue 15, 2012, Pages 15-23]
-
Shariat alavi, H
TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
-
Sharifzadeh, M
Modeling of the Rock Joints Mechanical Behavior Considering Surface Roughness during the Direct Shear Test [Volume 7, Issue 16, 2012, Pages 69-78]
-
Shojasadati, S.A
kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
T
-
Tabasi, S
Determination of Residual Component of Gravitimetry Data Using Probability Plot Modeling Method [Volume 7, Issue 17, 2013, Pages 23-32]
-
Tahmasebi, M.A
Determination of Optimized Excavation Pattern and Execution of Tunnel Support in the Weak Rocks (A Case Study) [Volume 7, Issue 15, 2012, Pages 97-102]
-
Tokhmchi, B
Application of clustering in preparation of pseudo geological maps using airborne geophysical data [Volume 7, Issue 16, 2012, Pages 1-12]
-
Torab, F.M
An investigation of grade variability of the Esfordi phosphate plant feed using
geostatistical method [Volume 7, Issue 14, 2012, Pages 51-61]
-
Torabi, S.R
Determination of Optimized Excavation Pattern and Execution of Tunnel Support in the Weak Rocks (A Case Study) [Volume 7, Issue 15, 2012, Pages 97-102]
V
-
Valian, A.R
Discharge Grate Effect on Simulation of Ball Mills [Volume 7, Issue 16, 2012, Pages 33-41]
-
Veshadi, M.A
Measuring Permeability Coefficient of a Granular Soil against Acidic Solutions in Heap Leaching Structures [Volume 7, Issue 16, 2012, Pages 43-52]
Y
-
Yarahmadi, M.R
Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
-
Yousefi, R
Presentation of Statistical Models for Predicting the Ornamental Stone
Sawability [Volume 7, Issue 14, 2012, Pages 31-40]
Z
-
Zakeri, M
Design and Installation of a Particle Size Analyzer for Mineral Processing Plants [Volume 7, Issue 14, 2012, Pages 99-105]
-
Zamani, A
Measuring Permeability Coefficient of a Granular Soil against Acidic Solutions in Heap Leaching Structures [Volume 7, Issue 16, 2012, Pages 43-52]
-
Zare, H.R
Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
-
Zare, Sh
Selection of Suitable Mechanized Machine for Tehran Metro Line7 Project (East – West Tunnel) [Volume 7, Issue 15, 2012, Pages 77-86]
-
Zarei, V
Estimating The Deformation Modulus of Rock Mass With Use of Seismic Tomography [Volume 7, Issue 17, 2013, Pages 83-92]
-
Zeidabadi, S
Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
-
Zoorabadi, M
Estimating The Deformation Modulus of Rock Mass With Use of Seismic Tomography [Volume 7, Issue 17, 2013, Pages 83-92]
-
Zoorabadi, M
TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
Your query does not match with any item